Roadworks on key routes to last until December with more in January

Australia News News

Roadworks on key routes to last until December with more in January
Australia Latest News,Australia Headlines
  • 📰 MENnewsdesk
  • ⏱ Reading Time:
  • 87 sec. here
  • 3 min. at publisher
  • 📊 Quality Score:
  • News: 38%
  • Publisher: 69%

The upgrade work near Wigan started this week have been designed to improve traffic flow. There have been road closures in place

Works to upgrade key routes near Wigan are expected to last until December, with more starting in January. The work in Newton-le-Willows, south Wigan, which started this week, have been designed to improve traffic flow.

Forming part of planning conditions imposed on the Parkside link road scheme, work will see improvements to the A49 Mill Lane/A572 Southworth Road junction, with a dedicated left-hand turn lane from the A572 to the A49 introduced – while improvements will be made to the right-hand turn lane from the A49 to the A572. In addition, existing traffic signals will be upgraded to the latest technology, incorporating enhanced pedestrian facilities at the junction.

Temporary signals will be in operation for the majority of the works, with some road closures required to allow resurfacing to be completed which will be communicated in advance. Cllr Seve Gomez-Aspron, St Helens Council’s cabinet member for strategic transport, said: “Once up and running, Parkside will be a hive of economic activity, so the purpose of these works is to improve our local infrastructure and accommodate workers travelling to and from employment generated by the development.

“The long-term benefits this scheme will bring certainly outweigh short-term inconveniences of road works which the council will look to keep disruption to a minimum as we strive to unlock the huge potential of the Parkside site which has lay derelict for far too long, bringing much needed jobs to the area – all while achieving one of our top priorities as a council of creating a well-connected, accessible transport network across the borough which supports economic growth.

Work at the A49 Mill Lane/A572 Southworth Road junction is expected to be completed by early December 2023, with work then required to the A572 Southworth Road/A573 Parkside Road Junction, starting in January 2024, details of which will be shared in advance.

We have summarized this news so that you can read it quickly. If you are interested in the news, you can read the full text here. Read more:

MENnewsdesk /  🏆 23. in UK

Australia Latest News, Australia Headlines

Similar News:You can also read news stories similar to this one that we have collected from other news sources.

Newcastle and Everton among clubs interested as Kalvin Phillips set to leave Man City in JanuaryNewcastle and Everton among clubs interested as Kalvin Phillips set to leave Man City in JanuaryPhillips stayed at the Etihad in the summer to fight for his place, but an exit is now increasingly likely after falling out of favour with Guardiola
Read more »

Liverpool urged to make £60m January move for midfielder who is 'fantastic fit'Liverpool urged to make £60m January move for midfielder who is 'fantastic fit'Liverpool could look to add one more solid defensive midfield option to their squad to complete their midfield rebuild - Robbie Savage backs Joao Palhinha to be that man
Read more »

Sources: Liverpool prioritise Andre deal in January after bid submittedSources: Liverpool prioritise Andre deal in January after bid submittedThe inside track on the football stories that matter
Read more »

Newcastle, Everton on red alert with Pep Guardiola tipped to offload Man City star in JanuaryNewcastle and Everton are reportedly interested in signing Manchester City midfielder Kalvin Phillips, who could be made available for loan in January.
Read more »



Render Time: 2025-02-28 13:16:07